-
PEB ENGINEERS & CONSTRUCTORS
PEB E&C take responsibility for delivery and ‘Turn-Key’ installation of the complete compressor system including cooler banks, suction & discharge piping and tie-in to customer piping system. In addition, the electrical and compressor control systems form part of the PEB E&C scope of supply and installation.
The testing protocol as agreed with the customer is implemented in phases, from factory test leading to site test and on-line commissioning and performance verification of the compressor system. After customer acceptance, the compressor system is officially entered into service.
– Reciprocating
– Screw
– Diaphragm
Material Options:
– Carbon Steel
– Stainless Steel
– Special Steel
Certification:
– PED 2014/68/EU
– ATEX 2014/34/EU
– Machinery Directive 2006/42/EC
Associated Equipment:
– Acoustic Enclosure
Engineering Activities:
– Unit control panels
– HAZOP / SIL Studies
– Pulsation Studies
– Mechanical Response Studies
– Feasibility Studies
– Upgrades
– Commissioning and Start-up
– Natural Gas
– Sour gas
– Wet gas
– Nitrogen
– Syngas
– Gas Motor Driven
– Electric Motor Driven
– Onshore
– Offshore
– Mobile
– Modular
– Carbon Steel
– Stainless Steel
– Special Steel
– PED 2014/68/EU
– ATEX 2014/34/EU
– Machinery Directive 2006/42/EC
– Acoustic Enclosure
– Unit control panels
– HAZOP / SIL Studies
– Pulsation Studies
– Mechanical Response Studies
– Feasibility Studies
– Upgrades
– Commissioning and Start-up