-
PEB ENGINEERS & CONSTRUCTORS
Installation
Following a successful FAT, the installation is shipped to site where it is installed by, or under the supervision of PEB E&C service engineers.
The final phase of the process follows the successful installation and commissioning of the system by PEB E&C engineers on site. The SAT normally consists of an extended run-test under operating conditions, to finally prove the system.
After successful SAT and customer acceptance, the compressor system is officially entered into service.
– Reciprocating
– Screw
– Diaphragm
– Natural Gas
– Sour gas
– Wet gas
– Nitrogen
– Syngas
– Gas Motor Driven
– Electric Motor Driven
– Onshore
– Offshore
– Mobile
– Modular
– Carbon Steel
– Stainless Steel
– Special Steel
– PED 2014/68/EU
– ATEX 2014/34/EU
– Machinery Directive 2006/42/EC
– Acoustic Enclosure
– Unit control panels
– HAZOP / SIL Studies
– Pulsation Studies
– Mechanical Response Studies
– Feasibility Studies
– Upgrades
– Commissioning and Start-up